ASSALAMUALAIKUM DAN SELAMAT SEJAHTERA

SELAMAT DATANG KE LAMAN BLOG SAYA.






Sunday, April 7, 2013

IOM (INTERCONNECTION OPERATION MANUAL) SOLAR MELAKA 5MWp





INTERCONNECTION OPERATION MANUAL

FOR GENERATION SYSTEM CONNECTED TO THE DISTRIBUTION NETWORK

AT

KMB MELAKA WORLD SOLAR VALLEY, SOLAR FARM DG SWITCHING ROOM

BETWEEN

TENAGA NASIONAL BERHAD

AND

KUMPULAN MELAKA BERHAD



JOINT APPROVAL

Developer / Cosultant Name Signature Date

Kumpulan Melaka Berhad Nordin Bin Ali

Kumpulan Melaka Berhad Ir. KhairulEzuan Bin Harun

Abena Consultant Ir. Shuhaili Bin Che Kob

TNB Department / Unit Name Signature Date

TNB Bahagian Pembahagian State Ketua Jurutera Name

TNB Bahagian Pembahagian State/PK/PC TKJ/PC/PK/PC Name

Pusat Kawalan Wilayah Zone (ZRCC) Name

TNB RE> Sansubari bin Che Mud

Document No:- IOM/TNB/ISESB/SSU/CD/2012/01



AKTIVITI SENGGARAAN 33KV & 11KV D PPU MANJALARA, KEPONG PADA 5 APRIL 2013

Pomen, En Mazlan, ex staf saya dulu masa di TNB Kepong sedang memberi penerangan keselamatan kepada semua TEAM Pasukan Kerja saya sebelum memulakan tugas. Masa bermula mengikut jadual adalah pada jam 10malam sampai 8 pagi. Tetapi kerja dapat dimulakan jam 4 pagi dan selesai jam 12tengahari. 7 jam masa non-aktif (produktif). Mungkin pengurusan atasan perlu melihat semula KPI. Untuk ex bos saya dulu, Datuk Seri Ir. Hj Azman Mohamad (CEO TNB), Datuk Ir. Baharin Din dan semua ex Bos semasa di TNB, terima kasih di atas tunjuk ajar dan nasihat dulu. Doakan kejayaan saya. Tak lupa juga ex Bos Tuan Haji Jani Baba semasa saya menjadi pembantu khas Pengurus Wilayah Selangor ketika itu.

Barisan pekerja sedang fokus dengan penerangan taklimat


Memulakan kerja-kerja senggaraan 33kv (7 Breaker Amston) belah kiri dan 11kv (16 breaker Toprank) belah kanan