Sunday, April 7, 2013
IOM (INTERCONNECTION OPERATION MANUAL) SOLAR MELAKA 5MWp
INTERCONNECTION OPERATION MANUAL
FOR GENERATION SYSTEM CONNECTED TO THE DISTRIBUTION NETWORK
AT
KMB MELAKA WORLD SOLAR VALLEY, SOLAR FARM DG SWITCHING ROOM
BETWEEN
TENAGA NASIONAL BERHAD
AND
KUMPULAN MELAKA BERHAD
JOINT APPROVAL
Developer / Cosultant Name Signature Date
Kumpulan Melaka Berhad Nordin Bin Ali
Kumpulan Melaka Berhad Ir. KhairulEzuan Bin Harun
Abena Consultant Ir. Shuhaili Bin Che Kob
TNB Department / Unit Name Signature Date
TNB Bahagian Pembahagian State Ketua Jurutera Name
TNB Bahagian Pembahagian State/PK/PC TKJ/PC/PK/PC Name
Pusat Kawalan Wilayah Zone (ZRCC) Name
TNB RE> Sansubari bin Che Mud
Document No:- IOM/TNB/ISESB/SSU/CD/2012/01
AKTIVITI SENGGARAAN 33KV & 11KV D PPU MANJALARA, KEPONG PADA 5 APRIL 2013
Pomen, En Mazlan, ex staf saya dulu masa di TNB Kepong sedang memberi penerangan keselamatan kepada semua TEAM Pasukan Kerja saya sebelum memulakan tugas. Masa bermula mengikut jadual adalah pada jam 10malam sampai 8 pagi. Tetapi kerja dapat dimulakan jam 4 pagi dan selesai jam 12tengahari. 7 jam masa non-aktif (produktif). Mungkin pengurusan atasan perlu melihat semula KPI. Untuk ex bos saya dulu, Datuk Seri Ir. Hj Azman Mohamad (CEO TNB), Datuk Ir. Baharin Din dan semua ex Bos semasa di TNB, terima kasih di atas tunjuk ajar dan nasihat dulu. Doakan kejayaan saya. Tak lupa juga ex Bos Tuan Haji Jani Baba semasa saya menjadi pembantu khas Pengurus Wilayah Selangor ketika itu.
Barisan pekerja sedang fokus dengan penerangan taklimat
Memulakan kerja-kerja senggaraan 33kv (7 Breaker Amston) belah kiri dan 11kv (16 breaker Toprank) belah kanan
Subscribe to:
Posts (Atom)